Sunday 18 December 2016

Test Bank for Systems Analysis and Design in a Changing World 7th Edition by Satzinger

For This And Any Other Latest Test Bank Or solution Manuals 


Contact Us At  WhisperHills@gmail.com




1. An information system often includes the software, the database, and the related manual processes.​


2. Systems analysis is sometimes referred to as “understanding and specification.”​


3. Systems design consists of activities to describe the solution to the problem.​


4. Systems development is always a formal activity with a beginning and an end.​


5. The SDLC means the Systems Design Life Cycle.​


6. Agile Development refers to the flexibility that programmers have in taking on various assignments.​


7. Iterative development is the same as Agile development.​


8. In iterative development the system is grown organically.​


9. The first core process is to plan the project.​


10. In iterative development, an iteration usually lasts about six weeks.​


11. The System Vision Document is usually developed before the project actually begins.​


12. The project plan is required to get the project approved.​


13. A Work Breakdown Structure is the first step in building a project schedule.​


14. During analysis activities the project team build two types of diagrams: Use Case diagram and Package diagram.​


15. The purpose of a workflow diagram is to document the internal steps of a use case.​


16. The ovals in a workflow diagram represent tasks.​


17. The database is designed using information from the class diagram.​


18. All the classes in the Design Class Diagram are used to define the database tables.​


19. A package diagram is useful to document the various subsystems in a system.​


20. Usually the final step in a given iteration is to deploy part of the system.​


21. One approach to the SDLC can be described using five core processes.​


22. An iteration normally only includes three or four of the core processes.​


23. Sometimes the activities within Core Process one are completed before the actual project starts.​


24. An information system consists of​


25. A person that functions as an architect to plan, capture the vision, and understand the needs for a new system is often called a ____________________.​


26. Those activities that enable a person to describe in the detail the system that solves the need is called __________________.​


27. SDLC stands for what?​


28. An information system development process that emphasizes flexibility to embrace change is called _____________________.​


29. When a system is partitioned into pieces, each piece is referred to as a _________________.​


30. Two important goals or steps within Core Process one are ____ and _____.​


31. Determine the major subsystems and assigning them to an iteration is done in which Core Process?​


32. Determining team members and assigning responsibilities is done in which Core Process?​


33. Two of the primary elements that are included in a Work Breakdown Structure include:​


34. The primary difference between a work breakdown structure and a work sequence draft is that the work sequence draft shows ___________________.​


35. The purpose of a use case is to _______.​


36. The purpose of a class diagram is to _______.​


37. The boxes on a class diagram can be thought of as a particular _______.​


38. The diagram that is most effective in describing the internal steps of a use case is _______.​


39. Performing in-depth fact finding to understand details is done as part of which Core Process?​


40. In a workflow diagram, the arrows that cross the center line are used to identify what?​


41. Designing the database schema is included in which Core Process?​


42. Detailed design is the thought process of how to program each _______.​


43. Another name for a workflow diagram is a(n) _______ diagram.​


44. To design the database schema, information from which diagram is the most important?​


45. Method signatures are included in which diagram?​


46. A diagram that shows the overall structure of a system as it exists after it is deployed is called what?​


47. Programming is included in which Core Process?​


48. Overall functional testing is included in which Core Process?​


49. What is the purpose of an iteration recap?​


50. What is the single activity that usually requires the most time during a project?​


51. What is usually the end result of an iteration?​


52. Which two answers identify the two middle core processes, i.e. core process 3 and 4? (choose two)​


53. Two of the primary benefits of iterative development include (choose two).​


54. What are the three parts of a System Vision Document?  (choose three)​


55. A work sequence draft provides three benefits to a project.  Which of the following are included in those benefits?​


56. What are the first two models, e.g. diagrams that include the entire system, that are built during the Core Process to discover and understand the details?​


57. Another term that is used to define a computer application is _______________.​

58. Those skills, steps, guides, and tools that support and lead up to the actual programming of the system are referred to as ___________________.​

59. A planned undertaking that has a beginning and an end and produces some result is called a _________________.​

60. What is the term that is used to describe all the activities to build, launch, and maintain an information system?​

61. A development process where the system is grown piece by piece is called ____________.​

62. The primary output of Core Process One and which is used to get project approval is called ___________________.​

63. A document that identifies and lists all of the tasks to be completed within an iteration is called a ___________________.​

64. A diagram that shows the method signatures in each class is called the _______.​

65. What is the name of the diagram that is often used to show the different layers of the system (view layer, etc.)?​

66. What do we call the type of testing that the users perform to ensure that the system meets the business requirements?​

67. Those activities that enable a person to understand and specify what the new system should accomplish are usually referred to as _________ __________.​

68. Those activities that enable a person to describe in detail how the information systems will actually be implemented are called ______ __________.​

69. ​_______________  _______________ is the term used to describe an information system development methodology that emphasizes flexibility and rapid response to anticipate new requirements during development.

70. List the six core processes.​

71. List the three components that are included in a System Vision Document.​

72. List the four steps required to conduct system test or user test.​



No comments:

Post a Comment